NHDC, a joint venture company of NHPC (51%) and the Government of Madhya Pradesh (49%) has completed and commissioned 88 MW Floating Solar Project in the Reservoir of Omkareshwar Hydroelectric Power Station.
After successful commissioning, NHDC has obtained CoD of the plant from Rewa Ultra Mega Solar Limited (RUMSL) on 29/10/2024.